I worked on Friday 3/14 from 5:50-11:00 pm for a total of 6.1 hours this week.
Total Hours: 28 so far
This Friday was my fifth time going to my WLE and I got there on time again. This Friday was very interesting because one of the vet techs came to talk to us. She told us that we are going to be getting in a lot of elephant seal pups and she came to talk to us about feeding. She first gave us a background to Elephant seals like how they are called black coats when they are firstborn, because of their long dark and curly languo coats. They nurse for about 28 days and they are with their mom the whole time. After those 28 days the mother leaves them and goes off to the sea. Once she was done giving us a background to the seals she told us about fish school and how to feed the fish and the process. Fish school is when they slowly start introducing the bigger pups to fish so that they get used to fish and will go and hunt fish when they go back out to the wild. So it was very interesting and I learned a lot. After we were done listening to the vet tech talk we started feeding. We went to the kitchen and prepared the food and then went to go feed the seals. I got to restrain about 3 seals while someone else tubed them. After we were done feeding they were getting in two new seals and I got to help them transport the two seals. Unfortunately one of the seals was very old and during transportation he died. So we had to take him into the necropsy room for them to check him out the next day and see if he was sick at all. After we were done transporting the seals we cleaned up and then went home.
So far my project is moving very slow. I have just been really busy with housework and homework that I have not gotten a chance to work on it, but I am planning on starting to work on it this weekend and then I will finish it up over the spring break. I do however know that I want to make a fixture for them to hold the pipes on to dry so that helps a bit.
I did not get a chance to talk to my mentor about presenting, but I think that it would just be easier to present at school on a day during advisory. I just think it would be to hard to coordinate at my workplace since I work Friday nights and then transportation is an issue for me on Monday. So my next step is I need to talk to josh about a good day for me to present my project during advisory. I am thinking right now that I will probably want to do it couple weeks into April so that way I have a chance to finish my project.
Wednesday, March 19, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment