Thursday, May 1, 2008

Week # 13

I worked on Friday 4/18 from 6:00-11:00pm for a total of 5 hours this week
Total Hours: 61.4 so far
This Friday again was another crazy day and we still had about 40 elephant seals. When I first got there I started helping to make elephant seal formula. Just like the last couple of weeks we had to make a lot for the morning shift. I started mixing the water, salmon oil and the milk powder while one of the other volunteers ground up the fish. I did this for a while. Then I went out to join everyone else for tubing. I got to do the tubing once again which was good, because that’s what I enjoy doing the most. All the seals that I fed ate their food just fine, which was good. After we got done with tubing we once again had a lot of dishes to do. The dishes took us a while, but we eventually go through all of them. After we were done with the dishes I brought some loads of laundry down to the washer.
I have not worked on my project recently, because I have been busy with other schoolwork. It is coming along well though. I still have quite a bit to do on it, but it’s a lot better off then it was. Hopefully I will have it done soon.

Wednesday, April 16, 2008

Week # 12

I worked on Friday 4/11 from 5:50pm until 11:00pm for a total of 5.2 hours this week.
Total Hours: 56.4 so far
Today was another crazy day at the Marine Mammal Center. We again had about 40 seals there. The first thing I did when I got there was I got the sinks ready for dish cleaning. I filled up one sink with cold water and bleach and another sink with hot water and soap. After that I helped board for some volunteers that were going into a pen to feed some seals. Again we did the cart system this time, because it is so much easier the having to go back to the kitchen after each feeding and I got to set everything up. Once I was done setting everything up we started feeding. I got partnered up with the same guy as last week and he was kind enough to let me tube the whole time. This time we did not have any problems all the seals ate their food and no one had any problems. After we were done feeding their was one more that needed to be done. So Graham, my mentor and I went over to feed the last guy and he restrained for me while I fed. After we were done with the feeding I went to the kitchen to help every one with the dishes. After the dishes were done I brought some loads of laundry over to get washed. We got done a lot earlier then last Friday, probably because we had more experienced people this time. I was happy that we got done earlier, because I was really tired.

I still need to do a lot of work on my project, but it is coming along. I have an idea of what I want to design for the rack I just have to draw it out. Then the keynote should not take me that long. Then as soon as I am done I will schedule a time to present my project.

Monday, April 14, 2008

Week # 11: Another Makeup Week

I worked Saturday 4/3 from 10am-4pm for a total of 7 hours this week
Total Hours: 51.2 so far

This Saturday I decided to work for my dad some more to make up some more hours. I helped him take some screws out of his mold so he could check to see how the turtle that he was making turned out and that took a while. Once I was done with that I did some sweeping and swept away some of the pieces of concrete that were on the ground. Then I helped my dad put some rocks onto a water structure that he is making, which was a lot of fun because we put them on in a mosaic type of way. After that I did some more sweeping and got most of the pieces of concrete out and dumped onto the pile that he has. The last thing that I did was to help one of his employees sand some shapes that they had cut out. These were shapes like blocks and they had some rough edges so I helped smooth the edges out. Helping my dad again helped my hours and I am still planning on extending my WLE so that I can get the rest of my hours in.

Week # 10

I worked 4/2 from 5:50pm to 12:00 am for a total of 6.1 hours this week
Total Hours: 44.2 so far

This Friday was my seventh time going to my WLE and it was another crazy day. We had about 40 seals so pretty much every pen was filled and most of them were getting tube fed. When I first got there we had to make more formula for feeding. I got to see how fish mash and the elephant seal formula is made, which is not the most pleasant thing to see. It really made me loose my appetite so I won’t go into details. I helped mix up the formula with this milk formula while one of the other volunteers blended all the ingredients together. We had to make two big buckets full of formula for feeding, besides the formula we already had. Once we were done with that it was time to feed. This Friday we started this new system where we take everything we need food, gloves, syringes, tubes, etc. and put it all on two carts and then took those two carts around with us to the pens. This makes it a lot easier, because we did not have to go to the kitchen after every feeding to bring in our dirty tubes.
Once we got settled at our first pen we broke up into pairs and started feeding. My partner was really nice and let me feed the whole night, which was nice because I prefer to feed over restraining. It all went well except for two seals. One seal threw up as soon as we put the tube down his mouth. He had not digested his food from the afternoon so we could not feed him. Another seal that we went into feed would not open his mouth. My partner kept trying all these different ways to get the seals mouth open that normally work, but none of them were working. We finally had to have Graham my mentor come over and he was able to get the seals mouth open and then it was fine, but we were kneeling there so long that my knees really hurt bad after feeding that seal. After feeding we had to make another big bucket full of formula for the people on the morning crew and my jacket was pretty full of formula by the end of the night. After we were done making more formula we had to do dishes. We had a lot of dishes to do since there were so many seals and also one of the girls had brought her friends and they did not really know what to do since they had not been on crew before so it took a long time to wash all the dishes. After that I took some towels to get washed and then it was time to go home.

My final project is going okay I am working on a sketch for it and then I need to start building it. My dad is out of town right now so I might not be able to start building it for a while, but as soon as he comes back I will start building it. I need to create a keynote and then I will at least be ready to show something to my advisory on my project.

Monday, March 31, 2008

Week # 9:A makeup week

I worked on Saturday 3/15 from 1-4 for a total of 4 hours
Total Hours: 38.1 so far
This Saturday I worked for my dad a bit to make up some hours. We first went down to San Francisco and fixed these buttons that were installed that kids press to get water to flow down this channel. They were not working properly so he had to totally replace the fixture. While he was fixing the strictures I kept an eye out and made sure none of the kids came to close or picked up his tools. I also told him if it was working properly or if there were any holes when he went to turn on the water. After we were done fixing the water structures we went back to my dads shop. Once we got back to his shop he had me shovel up concrete debri and get it into a pile and then I put it in a wheelbarrow. Once I had a bit in there I went to dump it in a pile off to the side. I unfortunately was not able to work for him for a long time, but it defiantly helped a bit with my hours. I have been trying to talk to my mentor about making up hours, but so far we have not gotten anywhere. So that really helped even if it was not for that long.

Week # 8

I worked on Friday 3/28 from 5:50 -11:00 pm for a total of 6.1 hours this week
Total hours: 34.1 so far
This Friday was my sixth time going to my WLE and I got there fine. This Friday was a very busy day for us, because the Marine Mammal Center had gotten in 31 new elephant seals and most of them had to be tube fed. The first thing that I did when I got there was to spread some novisand all over one of the empty pens to disinfect it and then I had to wait about 10 minutes, before I could wash it off. While the novisand was sitting my mentor had me go around to the pens and make sure all the heating pads were plugged in. Most of them were, but there were a couple that I had to plug in, however one I was not able to plug in because there were about 5 elephant seals in one pen and two of them were very curious when I came in to try and plug in the cord and I did not want to get bit since it was just me going into the pen.
After I was done with turning the heating pads on I went to wash the novisand out of the pen and then I went back to the kitchen. When I got back to the kitchen Sean who is another one of the head people that works with us on some Fridays was helping make up Elephant Seal formula. Normally we can just use the ones that are already in the fridge that the morning shift has used, but because we had about 35 seals we need more formula. One of the other volunteers was mixing up the formula and then she asked me if I wanted to help make it and stir it since I had not done that before and I said sure. It was somewhat fun mixing it up and we ended up filing about 6 containers with formula. After the formula was all done being made it was time to start feeding. I was partnered with my mentor for the feeding and I got to do some more feeding which was cool, because I really enjoy feeding a lot more then restraining. I also restrained two seals for another volunteer.
After we were done feeding I put a heating pad into a pen with two new seals that came and then I went back to the kitchen. When I got there we had to start cleaning up and washing and drying dishes. The sink area looked like Godzilla had come and broke in, because there was just so many syringes and tubes to wash and dry. Once we were done washing and cleaning up we went to go sign out and leave. Before we could leave there were two elephant seals that were stuck in the pool. So we had to get a net and help them out. It took a while to get them into the net but once we did we had to really quickly take them down the ramp to get them used to it and also so that they would not jump out of the net. It was like a roller coaster for them, cause we had to bring them down so fast and they both looked at us after we were done like “huh what was that?”. After I was done helping the other two volunteers with getting those guys out I washed up and then left to go home.
My project is going okay. I have brainstormed an idea for the clothes rack that I am going to make for the tubes. So now I just have to start building it. I will probably finish building it this weekend. Then I will have to work on a keynote, but that should not take me to long. I should be able to get my keynote done in about two days.
I think that this is definitely a career that I would look into. I have really been enjoying this WLE and I think that I am going to continue going even after the WLE is over, because I like it so much and I am going to need more hours. Some of the pros about it are that you get to work with seals, which is really cool. Getting them to eat fish is really nice, especially if no one else has been able to get them to eat and you were able to. There was a volunteer last week that got a seal to eat and no one else had been able to and she was really happy about that. Taking care of the Harper seal pups is really cool because there really cute and you get to hold them a bit while you are restraining them. Its also fun to tube feed, the restraining not as much, but tube feeding and giving them the formula is fun.
What’s frustrating about the job is when the seals don’t eat the fish and you have to wait there patiently and then they don’t eat it. What’s also sometimes annoying is when they take a while to open there mouth for you to put the tube in and you have to wait there patiently for a while its fine, but after a little bit it gets a bit annoying. Some other cons are there is a lot of cleaning to do like dishes and mopping the floors. Other then that it’s really good. I have just learned a lot more about what they do, because before this I did not realize what they do and did not think that they did a lot, but now I realize that they do. They feed the seals give some of the young ones sub ques, give them shots if they need it and write down the progress that certain ones have made with free feeding and tube feeding. I have also realized how important a job this is. If the Marine Mammal Center was not around a lot of seals might not be around or just not get the treatment they need, because of the Marine Mammal Center a lot of seals are saved and better off.

Wednesday, March 19, 2008

Week # 7

I worked on Friday 3/14 from 5:50-11:00 pm for a total of 6.1 hours this week.
Total Hours: 28 so far
This Friday was my fifth time going to my WLE and I got there on time again. This Friday was very interesting because one of the vet techs came to talk to us. She told us that we are going to be getting in a lot of elephant seal pups and she came to talk to us about feeding. She first gave us a background to Elephant seals like how they are called black coats when they are firstborn, because of their long dark and curly languo coats. They nurse for about 28 days and they are with their mom the whole time. After those 28 days the mother leaves them and goes off to the sea. Once she was done giving us a background to the seals she told us about fish school and how to feed the fish and the process. Fish school is when they slowly start introducing the bigger pups to fish so that they get used to fish and will go and hunt fish when they go back out to the wild. So it was very interesting and I learned a lot. After we were done listening to the vet tech talk we started feeding. We went to the kitchen and prepared the food and then went to go feed the seals. I got to restrain about 3 seals while someone else tubed them. After we were done feeding they were getting in two new seals and I got to help them transport the two seals. Unfortunately one of the seals was very old and during transportation he died. So we had to take him into the necropsy room for them to check him out the next day and see if he was sick at all. After we were done transporting the seals we cleaned up and then went home.
So far my project is moving very slow. I have just been really busy with housework and homework that I have not gotten a chance to work on it, but I am planning on starting to work on it this weekend and then I will finish it up over the spring break. I do however know that I want to make a fixture for them to hold the pipes on to dry so that helps a bit.
I did not get a chance to talk to my mentor about presenting, but I think that it would just be easier to present at school on a day during advisory. I just think it would be to hard to coordinate at my workplace since I work Friday nights and then transportation is an issue for me on Monday. So my next step is I need to talk to josh about a good day for me to present my project during advisory. I am thinking right now that I will probably want to do it couple weeks into April so that way I have a chance to finish my project.